Construction of the Huadyan-Teninskaya CHPP in the city of Yaroslavl
• The project operator – OJSC “Territorial Generating Company No. 2”
• Project cost – 1.7 billion yuan
• Commissioning of the Huadyan-Teninskaya CHPP took place on June 20, 2017.
• The electric power of the CHPP is 450 MW, and the heat capacity is about 300 Gcal / h.